- ホーム
- > 洋書
- > 英文書
- > Science / Mathematics
Full Description
A systematic approach to developing and reading P&IDs across industries
Now in its Second Edition, Piping and Instrumentation Diagram Development provides a systematic method for developing and interpreting P&IDs, the focal documents during design, operation, and maintenance of process plants. Written by Moe Toghraei, a process engineer with over 30 years of industry experience, this updated edition expands on the original with roughly 15% new content throughout and numerous additional examples.
The book addresses the three main components of a process plant—equipment and other process items, control systems, and utility systems—with detailed P&ID development skills for each. This edition adds an entirely new chapter on Process Flow Diagram development and significantly expands Chapter 20 with more worked examples. Instrumentation content follows ISA standards throughout.
Readers will also find:
A multidisciplinary presentation of P&ID concepts accessible to process, mechanical, and instrument and control engineers across sectors
Detailed symbology for each element covered, drawing from international practices used in Europe, Canada, the US, and Japan
An expanded examples chapter with additional worked problems illustrating real-world P&ID development scenarios across multiple industries
Coverage applicable to oil refineries, gas processing plants, food processing facilities, water treatment plants, and HVAC systems
Guidance supporting HAZOP studies, value engineering, and operational activities beyond conventional P&ID development tasks
Process engineers, instrument and control practitioners, and mechanical engineers involved in P&ID development for chemical, oil and gas, water treatment, food processing, or mining operations will find this book a direct resource for strengthening their diagramming practice and deepening their understanding of process plant design.
Contents
Contents
Preface xxi
Acknowledgment xxv
About the Companion Website xxvii
Part I Fundamentals of Piping and Instrumentation Diagram Development 1
1 What Is Piping and Instrumentation Diagram? 3
1.1 Why Is P&ID Important? 3
1.2 What Is a P&ID? 4
1.3 P&ID Media 5
1.4 P&ID Development Activity 6
2 Management of Piping and Instrumentation Diagram Development 9
2.1 Project of Developing P&IDs 9
2.2 P&ID Milestones 9
2.3 Involved Parties in P&ID Development 11
2.4 P&ID Set Owner 12
2.5 Required Quality of the P&ID in Each Stage of Development 12
2.6 P&ID Evolution 13
2.7 Tracking Changes in P&IDs 13
2.8 Required Man-hours for the Development of P&IDs 14
3 Anatomy of a Piping and Instrumentation Diagram Sheet 15
3.1 Title Block 15
3.2 Ownership Block 16
3.3 Reference Drawing Block 16
3.4 Revision Block 16
3.5 Comments Block 17
3.6 Main Body of a P&ID 20
4 General Rules in Drawing of P&IDs 21
4.1 Items on P&IDs 21
4.2 How to Show Them: Visual Rules 22
4.3 Item Identifiers in P&IDs 28
4.4 Different Types of P&IDs 34
4.5 A Set of P&IDs 41
4.6 P&IDs Prepared in Engineering Companies Compared to Manufacturing or Fabricating Companies 43
4.7 Dealing with Vendor or Licensor P&IDs 44
5 Principles of Piping and Instrumentation Diagram Development 47
5.1 Plant Stakeholders 47
5.2 The Hierarchy of P&ID Development Rules 47
5.3 Plant Operations 48
5.4 What Should a P&ID Address? 55
5.5 Conflicting Check and Merging Opportunities Check 67
5.6 Dealing with Common Challenges in P&ID Development 67
5.7 Example: Development of P&ID of a Typical Pump 68
Part II Pipes and Equipment 73
6 Fluid Conductors and Pipe Appurtenance 75
6.1 Fluid Conductors: Pipes and Tubes 75
6.2 Pipe Identifiers 75
6.3 Pipe Tag Anatomy 79
6.4 Pipes Crossing "Borders" 84
6.5 Goal of Piping 89
6.6 Piping Arrangements 90
6.7 Pipe Route 93
6.8 Piping Movement 97
6.9 Dealing with Unwanted Two-phase Flow in Pipes 98
6.10 Tubes 102
6.11 Double-wall Pipes 102
6.12 Pipes for Special Arrangements 103
6.13 Pipe Size Rule of Thumbs 104
6.14 Pipe Appurtenances 104
6.15 Other Approach About Piping 110
6.16 Tying-in Pipes 111
6.17 Wrapping Up: Addressing Requirements of Pipe During the Life Span 111
6.18 Transferring Bulk Solid Materials 112
Reference 112
7 Manual Valves and Automatic Valves 113
7.1 Valve Naming 113
7.2 Valve Functions 113
7.3 Valve Structure 113
7.4 Classification of Valves 114
7.5 Valve Operators 120
7.6 Different Types of Actuators 121
7.7 Basis of Operation for Automatic Valves 122
7.8 Tagging Automatic Valves 122
7.9 Tagging Manual Valves 122
7.10 Valve Positions 122
7.11 Valve Arrangement 127
7.12 Control Valves and RO Combinations 129
7.13 Operating in the Absence of Valves 129
7.14 Valves in Role of Unit Operation 132
7.15 Special Valves 133
7.16 Excess Flow Valves 136
7.17 Valve Combinations 136
7.18 End-of-valve Arrangements 136
7.19 Valve Sizing Rule of Thumbs 136
7.20 Merging Valves 138
7.21 Wrapping-up: Addressing Requirements of Valve During the Life Span 138
References 138
8 Provisions for Ease of Maintenance 139
8.1 Introduction 139
8.2 Different Types of Equipment Care 139
8.3 In-place In-line Equipment Care 140
8.4 In-place Off-line Equipment Care 141
8.5 In-workshop Off-line Equipment Care 141
8.6 Preparing Equipment for Off-line Care 141
8.7 Isolation 142
8.8 Bringing the Equipment to a Non-harmful Condition 147
8.9 Cleaning 151
8.10 Ultimate Destination of Dirty Fluids 153
8.11 Making Equipment Easy to Remove 154
8.12 Wrap-up 154
9 Containers 157
9.1 Introduction 157
9.2 Selection of Containers 157
9.3 Containers Purposes 158
9.4 Transferring Fluids Between Containers 159
9.5 Container Positions 160
9.6 Container Shapes 162
9.7 Container Identifiers 163
9.8 Levels in Non-flooded Liquid Containers 166
9.9 Container Nozzles 166
9.10 Overflow Nozzles 173
9.11 Breathing of Non-flooded Containers 174
9.12 Blanketed Tanks 174
9.13 Heating (or Cooling) in Containers 177
9.14 Mixing in Containers 178
9.15 Container Internals 179
9.16 Tank Roofs 179
9.17 Tank Floors 179
9.18 Container Arrangement 180
9.19 Merging Containers 180
9.20 Secondary Containment 181
9.21 Underground Storage Tanks 182
9.22 Sumps 184
9.23 Wrapping-up: Addressing the Requirements of the Container During Its Lifespan 184
10 PUMPS and Compressors 187
10.1 Introduction 187
10.2 Fluid Mover Roles 187
10.3 Types of Fluid Movers 187
10.4 A Brief Discussion on the Function of Fluid Movers in a System 188
10.5 Fluid Mover Identifiers 189
10.6 Liquid Movers: Dynamic Pumps 192
10.7 Liquid Movers: PD Pumps 210
10.8 Gas Movers: Fans, Blowers, Compressors 216
10.9 Wrapping-up: Addressing Requirements of Fluid Movers During the Life Span 221
Reference 221
11 Heat Transfer Units 223
11.1 Introduction 223
11.2 Main Types of Heat Transfer Units 223
11.3 Different Types of Heat Exchangers and Their Selection 224
11.4 Different Types of Heat Transfer Fluids and Their Selection 225
11.5 Heat Exchangers: General Naming 226
11.6 Heat Exchanger Identifiers 227
11.7 Heat Exchanger P&ID 229
11.8 Heat Exchanger Arrangement 231
11.9 Aerial Coolers 233
11.10 Merging Heat Exchangers 236
11.11 Wrapping-up: Addressing the Requirements of a Heat Exchanger During Its Life Span 236
11.12 Fired Heaters and Furnaces 236
11.13 Fire Heater Arrangement 240
11.14 Merging Fired Heaters 240
11.15 Wrapping-up: Addressing the Requirements of Fired Heaters During Their Lifespan 240
12 Pressure Relief Devices 241
12.1 Introduction 241
12.2 Why Pressure Is So Important? 241
12.3 Dealing with Abnormal Pressures 242
12.4 Safety Relief System 244
12.5 What Is an "Enclosure," and Which "Side" Should Be Protected? 244
12.6 Regulatory Issues Involved in PRVs 245
12.7 PRD Structure 246
12.8 Six Steps to Providing a Protective Layer 247
12.9 Locating PRDs 247
12.10 Positioning PRDs 248
12.11 Specifying the PRD 250
12.12 Selecting the Right Type of PRD 250
12.13 PRD Identifiers 251
12.14 Selecting the Right Type of PSD Arrangement 253
12.15 Deciding on an Emergency Release Collecting Network 255
12.16 Deciding on a Disposal System 257
12.17 Protecting Atmospheric Containers 261
12.18 Merging PRDs 262
12.19 Wrapping-up: Addressing the Requirements of PRDs During Their Lifespan 264
Part III Instrumentation and Control System 265
13 Fundamentals of Instrumentation and Control 267
13.1 What Is Process Control? 267
13.2 Components of Process Control Against Violating Parameters 268
13.3 Parameters Versus Steering/Protecting Components 268
13.4 How Many Steering Loops Are Needed? 269
13.5 ICSS System Technology 269
13.6 ICSS Elements 271
13.7 Basic Process Control System 272
13.8 Instruments on P&IDs 274
13.9 Instrument Identifiers 275
13.10 Signals: Communication Between Instruments 281
13.10.1 Signal Types 281
13.11 Different Instrument Elements 284
13.12 Simple Control Loops 294
13.13 Position of Sensor Regarding Control Valves 296
14 Application of Control Architectures 299
14.1 Introduction 299
14.2 Control System Design 299
14.3 Selecting the Parameter to Control 299
14.4 Identifying the Manipulated Stream 301
14.5 Determining the Set Point 301
14.6 Building a Control Loop 302
14.7 Multi-loop Control Architectures 304
14.8 Feedforward Plus Feedback Control 307
14.9 Monitoring Parameters 321
15 Plant Process Control 327
15.1 Introduction 327
15.2 Plant-wide Control 327
15.3 Heat and Mass Balance Control 327
15.4 Surge Control 329
15.5 Equipment Control 336
15.6 Pipe Control System 338
15.7 Fluid Mover Control System 345
15.8 Heat Transfer Equipment Control 356
15.9 Container Control System 368
15.10 Blanket Gas Control Systems 368
Reference 369
16 Plant Interlocks and Alarms 371
16.1 Introduction 371
16.2 Safety Strategies 371
16.3 Concept of an SIS 371
16.4 SIS Actions and SIS Types 371
16.5 SIS Extent 374
16.6 Deciding on the Required SIS 374
16.7 The Anatomy of an SIS 375
16.8 Showing Safety Instrumented Functions on P&IDs 379
16.9 Discrete Control 381
16.10 Alarm System 382
16.11 Fire and Gas Detection System 387
16.12 Electric Motor Control 390
Part IV Utilities 397
17 Utilities 399
17.1 Utility System Components 399
17.2 Developing Piping and Instrumentation Diagrams for Utility Systems 400
17.3 Different Utilities in Plants 404
17.4 Air as a Utility in Process Plants 404
17.5 Water as a Utility in Process Plants 405
17.6 Heat Transfer Media 405
17.7 Condensate Collection Network 407
17.8 Fuel as Utility 407
17.9 Inert Gas 408
17.10 Vapor Collection Network 409
17.11 Emergency Vapor/Gas Release Collection Network 409
17.12 Fire Water 409
17.13 Surface Drainage Collection Network or Sewer System 412
17.14 Utility Circuits 414
17.15 Connection Between Distribution and Collecting Networks 418
18 Ancillary Systems and Additional Considerations 421
18.1 Introduction 421
18.2 Safety Issues 421
18.3 Dealing with the Environment 424
18.4 Utility Stations 431
18.5 Off-line Monitoring Programs 434
18.6 Corrosion Monitoring Program 438
18.7 Impact of the Plant Model on the P&ID 439
18.8 Design Pressure and Temperature Considerations 440
Part V Additional Information and General Procedure 447
19 Pre-Piping and Instrumentation Diagrams in Chemical Process Engineering 449
19.1 Visual Representation Techniques in Chemical Process Engineering 449
19.2 Universal String of Chemical Process Industries 451
19.3 Pre-BFD Stage Development 453
19.4 BFD Development 457
19.5 PFD Development 459
19.6 PFD Demonstration Rules 465
19.7 H&MBT 466
19.8 Side-by-Side Comparison 467
19.9 Nontraditional Process Drawings 467
19.10 Developing PFD Based on Existing P&ID 468
19.11 Developing P&ID Based on Existing Process Plant 469
20 General Procedures 471
20.1 Introduction 471
20.2 General Procedure for P&ID Development 471
20.3 P&ID Reviewing and Checking 475
20.4 Methods of P&ID Reviewing and Checking 479
20.5 Required Quality of P&IDs at Each Stage of Development 480
21 Examples 485
Index 521



