- ホーム
- > 洋書
- > 英文書
- > Business / Economics
Full Description
The building performance evaluation (BPE) framework emphasizes an evaluative stance throughout the six phases of the building delivery and life cycle: (1) strategic planning/needs analysis; (2) program review; (3) design review; (4) post-construction evaluation/review; (5) post-occupancy evaluation; and, (6) facilities management review/adaptive reuse.
The lessons learned from positive and negative building performance are fed into future building delivery cycles. The case studies illustrate how this basic methodology has been adapted to a range of cultural contexts, and indicates the positive results of building performance assessment in a wide range of situations.
Contents
Part I: Introduction and Overview, Part II: Performance Assessments in the Building Delivery and Life Cycle, Part III: Case Studies,Part IV: Epilogue and Outlook Into the Future.